The first two German power plants in the portfolio of the RENAIO Infrastructure Fund Hydropower
On Tuesday, June 14, 2022, the RENAIO Infrastructure Fund Hydropower acquired the first two German hydropower plants “Obertsrot” and “Gernsbach” with a total installed capacity of 806 KW for the portfolio.
The “Gernsbach” plant is located in the southwest of Germany, in the Black Forest along the Murg river, between Gernsbach and the district of Obertsrot. The “Obertsrot” hydropower plant is only approx. 1 km away from the Gernsbach plant.
<<
